| CIMAS PIPING CAPABILITY |
Engineer Capability |
| No |
Major Code |
_ |
Description |
Capability |
| Piping Layout |
| 1 |
XG91 |
|
Piping MTO |
|
| 2 |
XG81 |
|
Flushing & Blowing Package |
L5 |
| 3 |
XG80 |
|
Hydraulic Test Package |
L5 |
| 4 |
XG70 |
|
Steam Tracing for Piping & Instrument |
L5 |
| 5 |
XG62 |
|
Pipe Support Location Plan |
L5 |
| 6 |
XG60 |
|
Pipe Support 3D Modeling |
L5 |
| 7 |
XG43 |
|
U/G Piping Spool Piece Dwg |
L5 |
| 8 |
XG42 |
|
U/G Piping Iso Dwg |
L5 |
| 9 |
XG41 |
|
U/G Piping Arrangement Dwg |
L5 |
| 10 |
XG40 |
|
U/G Piping 3D Modeling |
L5 |
| 11 |
XG33 |
|
A/G Piping Spool Piece Dwg |
L5 |
| 12 |
XG32 |
|
A/G Piping Iso Dwg |
L5 |
| 13 |
XG31 |
|
A/G Piping Arrangement Dwg |
L5 |
| 14 |
XG30 |
C |
SP3D |
L5 |
| 15 |
XG30 |
B |
PDMS |
L5 |
| 16 |
XG30 |
A |
PDS |
L5 |
| 17 |
XG23 |
|
Long Distance Transmission Line Layout |
L5 |
| 18 |
XG20 |
|
A/G Piping General Layout |
L5 |
| 19 |
XG14 |
|
Piping Engineering Data Sheet |
L5 |
| 20 |
XG13 |
|
Piping CAD Customization |
L5 |
| 21 |
XG11 |
|
Piping Engineering Standard |
L5 |
| 22 |
XG10 |
|
Piping Engineering Specification |
L5 |
| 23 |
XG01 |
|
Piping General(Administration & Coordination) |
L5 |
| 24 |
XB93 |
1 |
As Built Drawing |
|
| 25 |
XB71 |
1 |
Squad Check |
L5 |
| 26 |
XB34 |
|
Model Review/3D Model Interference Check |
L5 |
| Plot Plan |
| 1 |
XB93 |
2 |
As Built Drawing |
|
| 2 |
XB71 |
2 |
Squad Check |
L5 |
| 3 |
XB54 |
|
Value Engineering |
L4 |
| 4 |
XB33 |
B |
Conceptual Plan for Paving |
L5 |
| 5 |
XB33 |
A |
Conceptual Plan for Fireproofing Requirement |
L5 |
| 6 |
XB32 |
|
Equipment Location Plan |
L5 |
| 7 |
XB31 |
|
Conceptual Plot Plan |
L5 |
| 8 |
XB22 |
|
Field Survey (Site Review / Study / Sketch / Field Investigation ) |
L3 |
| 9 |
XB21 |
|
Feasibility Study/Technical Aid |
L3 |
| Piping Material |
| 1 |
XL98 |
D |
BOQ for Construction Requisition - Piping Insulation Work |
L3 |
| 2 |
XL98 |
C |
Insulation Vendor Document Review |
L3 |
| 3 |
XL98 |
B |
Insulation Material TBE |
L3 |
| 4 |
XL98 |
A |
Insulation Material Requisition |
L3 |
| 5 |
XL96 |
D |
BOQ for Construction Requisition - Piping Coating & Wrapping Work |
L3 |
| 6 |
XL96 |
C |
Coating & Wrapping Vendor Document Review |
L3 |
| 7 |
XL96 |
B |
Coating & Wrapping Material TBE |
L3 |
| 8 |
XL96 |
A |
Coating & Wrapping Material Requisition |
L3 |
| 9 |
XL91 |
D |
BOQ for Construction Requisition - Piping Painting Work |
L3 |
| 10 |
XL91 |
C |
Painting Vendor Document Review |
L3 |
| 11 |
XL91 |
B |
Painting Material TBE |
L3 |
| 12 |
XL91 |
A |
Painting Material Requisition |
L3 |
| 13 |
XL12 |
|
Specification for Underground piping Coating and Wrapping |
L3 |
| 14 |
XL11 |
|
Specification for External Painting |
L3 |
| 15 |
XG92 |
D |
BOQ for Construction Requisition - Piping Work |
L5 |
| 16 |
XL10 |
|
Specification for External Insulation |
L3 |
| 17 |
XG92 |
C |
A/G & U/G Piping Material Vendor Document Review |
L5 |
| 18 |
XG92 |
B |
A/G & U/G Piping Material TBE |
L5 |
| 19 |
XG92 |
A |
A/G & U/G Piping Material Requisition |
L5 |
| 20 |
XG91 |
B |
Piping MTO/QTO Transfer and Upload to SPMat & CMS |
L5 |
| 21 |
XG91 |
A |
Piping MTO/QTO Summary |
L5 |
| 22 |
XG15 |
|
Line List |
L5 |
| 23 |
XG12 |
|
Piping Material Specification |
L4 |
| 24 |
XB71 |
3 |
Squad Check |
L5 |
| Stress Analysis |
| 1 |
XB71 |
4 |
Squad Check |
L5 |
| 2 |
XG50 |
A |
A/G Piping Stress Analysis & Coding-Static |
L5 |
| 3 |
XG50 |
B |
A/G Piping Stress Analysis & Coding-Dynamic |
L5 |
| 4 |
XG50 |
C |
U/G Piping Stress Analysis & Coding |
L5 |
| 5 |
XG50 |
D |
Piping Surge Analysis |
L5 |
| 6 |
XG50 |
E |
Acoustic Simulation Analysis |
L5 |
| 7 |
XG50 |
F |
Finite Element Analysis |
L5 |
| 8 |
XG51 |
|
Simplified Calculation for Piping Flexibility |
L5 |
| 9 |
XG61 |
|
Detail of Pipe Support-Special Type |
L5 |
| 10 |
XG63 |
|
Pipe Support Loading Calculation |
L5 |
| 11 |
XG94 |
A |
Pipe Support Material Summary/ Requisition |
L5 |
| 12 |
XG94 |
B |
Pipe Support Material TBE |
L5 |
| 13 |
XG94 |
C |
Pipe Support Material Vendor Document Review |
L5 |
| UG & FF |
| 1 |
XB71 |
5 |
Squad Check |
L5 |
| 2 |
XG21 |
|
U/G Piping General Layout |
L5 |
| 3 |
XG22 |
|
F/F Piping General Layout |
L5 |
| 4 |
XG24 |
|
Fire Fighting System Flow Diagram |
L5 |
| 5 |
XG25 |
|
Fire Fighting System Description & Operation Manual |
L5 |
| 6 |
XG26 |
|
Permit Application |
L5 |
| 7 |
XG27 |
|
Fire Fighting System Hydraulic Calculation |
L5 |
| 8 |
XG28 |
|
Fire Fighting System Commissioning Procedure |
L5 |
| 9 |
XG29 |
|
Fire Fighting System Test |
L5 |
| 10 |
XG93 |
A |
F/F Piping Material Summary/ Requisition |
L5 |
| 11 |
XG93 |
B |
F/F Piping Material TBE |
L5 |
| 12 |
XG93 |
C |
F/F Piping Material Vendor Document Review |
L5 |
| 13 |
XB93 |
5 |
As Built Drawing |
L5 |
|
|