| CIMAS PROCESS CAPABILITY |
Engineer Capability |
| No |
Major Code |
_ |
Description |
Capability |
| Front End Engineering Data |
| 1 |
XB02 |
A |
System Specification |
L3 |
| 2 |
XB04 |
C |
Essential/Emergency Power Requirement Data |
L1 |
| 3 |
XB04 |
E |
Electrical/Motor Control Requirement & Interface Data |
L1 |
| 4 |
XB05 |
A |
Project Specification /Standard/Drawing Review |
L5 |
| 5 |
XB07 |
|
Process Waste Quality and Quantity Data |
L2 |
| 6 |
XB08 |
A |
Maximum Evaporation Rate Calculation for Authority |
L1 |
| 7 |
XB08 |
B |
CNS Requirement for Pressure Equipment |
L1 |
| 8 |
XB08 |
C |
Fire Fighting Related Process Data |
L3 |
| Mechanical Flow Diagram (P & ID) |
| 1 |
XB11 |
A |
Mechanical Flow Diagram (P & ID) |
L5 |
| 2 |
XB11 |
B |
Intelligent Mechanical Flow Diagram (P & ID) |
L5 |
| 3 |
XB12 |
A |
Utility System Flow Diagram (Generation) |
L5 |
| 4 |
XB12 |
B |
Utility System Flow Diagram (Distribution) |
L5 |
| 5 |
XB12 |
C |
Offsite System Flow Diagram |
L5 |
| 6 |
XB12 |
D |
Intelligent Offsite System Flow Diagram |
L5 |
| 7 |
XB12 |
E |
Intelligent Utility System Flow Diagram (Generation) |
L5 |
| 8 |
XB12 |
F |
Intelligent Utility System Flow Diagram (Distribution) |
L5 |
| Feasibility Study/Technical Aid & Field Survey |
| 1 |
XB21 |
|
Feasibility Study/Technical Aid |
L1 |
| 2 |
XB22 |
|
Field Survey (Site Review / Study / Sketch / Field Investigation ) |
L4 |
| Plot Plan & Model Review |
| 1 |
XB34 |
|
Model Review/3D Model Interference Check |
L5 |
| Technical Document Center / Project IT / HSE |
| 1 |
XB53 |
J |
Hazard and Operability Studies |
L1 |
| Package / System Equipment |
| 1 |
XB61 |
B |
Technical Bid Evaluation |
L4 |
| 2 |
XB61 |
C |
Vendor Data Review |
L5 |
| Squad Check |
| 1 |
XB71 |
|
Squad Check |
L5 |
| Plant Start-Up Service (Job Site Work Excluded) |
| 1 |
XB81 |
A |
Operator Menu |
L2 |
| 2 |
XB81 |
C |
Mechanical Check-Up Planning |
L1 |
| 3 |
XB81 |
E |
Operator Training |
L5 |
| Data Book / Permitting / Drawing |
| 1 |
XB91 |
|
Data Book / Document Hand Over |
L4 |
| 2 |
XB93 |
|
As Built Drawing |
L5 |
| Administration and Coordination |
| 1 |
XC01 |
A |
Process Scheme Establishment and/or Optimization |
L3 |
| 2 |
XC01 |
B |
Process Survey Evaluation & Selection |
L4 |
| 3 |
XC01 |
C |
Plant Planning |
L2 |
| 4 |
XC01 |
D |
Process Consultation |
L4 |
| 5 |
XC01 |
E |
Preliminary Hazard Analysis |
L1 |
| Process Information & Basic Data |
| 1 |
XC21 |
A |
Define & Calculation of Physical & Thermodynamic Properties |
L3 |
| 2 |
XC21 |
B |
Review Process Data from Outside Sources |
L5 |
| 3 |
XC21 |
C |
Clarify Criteria for Process Design |
L5 |
| 4 |
XC21 |
D |
Process Briefing/Process Description |
L5 |
| 5 |
XC21 |
E |
Utility Balance /Summary |
L5 |
| 6 |
XC21 |
F |
Drainage Philosophy |
L5 |
| 7 |
XC21 |
G |
Function Calculation for Waste Water Treatment System |
L1 |
| 8 |
XC22 |
|
Piping Fluid Index |
L5 |
| Equipment Sizing and Data Sheet |
| 1 |
XC31 |
|
Reactor Sizing & Data Sheet |
L1 |
| 2 |
XC32 |
A |
Tower Sizing & Data Sheet |
L1 |
| 3 |
XC32 |
B |
Drum Sizing & Data Sheet |
L5 |
| 4 |
XC32 |
C |
Tank Sizing & Data Sheet |
L5 |
| 5 |
XC32 |
D |
CPI Civil Sketch & Data Sheet |
L4 |
| 6 |
XC33 |
A |
Shell and Tube Heat exchanger Sizing & Data Sheet (Single Phase) |
L5 |
| 7 |
XC33 |
B |
Shell and Tube Heat Exchanger Sizing & Data Sheet (Two Phase) |
L2 |
| 8 |
XC33 |
C |
Air Fin Cooler Sizing Data Sheet |
L1 |
| 9 |
XC33 |
D |
Fire Heater Sizing and Data Sheet |
L1 |
| 10 |
XC33 |
E |
Other Heat Transfer Equipment Data Sheet |
L4 |
| 11 |
XC34 |
A |
Material Handling System Process data |
L4 |
| 12 |
XC34 |
B |
Refrigerant Package Calculation & Data Sheet |
L1 |
| 13 |
XC34 |
C |
Pump Calculation & Data Sheet |
L5 |
| 14 |
XC34 |
D |
Compressor Calculation & Data Sheet |
L3 |
| 15 |
XC34 |
E |
Fan/Blower Calculation & Data Sheet |
L1 |
| 16 |
XC34 |
F |
Turbine Calculation & Data Sheet |
L1 |
| 17 |
XC34 |
G |
Cooling Tower Data Sheet |
L3 |
| 18 |
XC34 |
H |
Agitator Calculation & Data Sheet |
L1 |
| 19 |
XC34 |
J |
Other Machinery Data Sheet |
L5 |
| 20 |
XC35 |
A |
Special Equipment Data Sheet-Filter |
L5 |
| 21 |
XC35 |
B |
Special Equipment Data Sheet-Ejector |
L2 |
| 22 |
XC35 |
C |
Special Equipment Data Sheet-Deaerator |
L2 |
| 23 |
XC35 |
D |
Special Equipment Data Sheet-DesuperHeater |
L2 |
| 24 |
XC35 |
E |
Special Equipment Data Sheet-Flare Package |
L1 |
| 25 |
XC35 |
F |
Special Equipment Data Sheet-Others |
L4 |
| 26 |
XC35 |
G |
Process Equipment Package Data Sheet |
L4 |
| Flow Diagram & Summary/List |
| 1 |
XC41 |
A |
Process Flow Diagram |
L4 |
| 2 |
XC41 |
B |
Utility Balance Diagram |
L5 |
| 3 |
XC41 |
C |
Material and Energy Balance |
L5 |
| 4 |
XC42 |
A |
Mechanical Flow Diagram (IFD) |
L5 |
| 5 |
XC42 |
B |
Preliminary Intelligent Mechanical Flow Diagram |
L5 |
| 6 |
XC43 |
A |
Utility System Flow Diagram (IFD) |
L5 |
| 7 |
XC43 |
B |
Preliminary Intelligent Utility System Flow Diagram |
L5 |
| 8 |
XC43 |
C |
Offsite System Flow Diagram (IFD) |
L5 |
| 9 |
XC43 |
D |
Preliminary Intelligent Offsite System Flow Diagram |
L5 |
| 10 |
XC44 |
|
Customization for Intelligent Flow Diagram |
L5 |
| 11 |
XC45 |
|
Preliminary Equipment List |
L5 |
| 12 |
XC46 |
|
Tie-in Summary |
L5 |
| Line Sizing/Hydraulic Check |
| 1 |
XC51 |
A |
Line Sizing & Pressure Balance (Single Phase) |
L5 |
| 2 |
XC51 |
B |
Line Sizing & Pressure Balance (Two Phase) |
L5 |
| 3 |
XC51 |
C |
Line List & Schedule |
L5 |
| 4 |
XC52 |
A |
Hydraulic Check-Reboiler Circuit |
L5 |
| 5 |
XC52 |
B |
Hydraulic Check-Tower Overhead Line |
L5 |
| 6 |
XC52 |
C |
Hydraulic Check-Furnace Transfer Line |
L1 |
| 7 |
XC52 |
D |
Hydraulic Check-Slurry Line |
L5 |
| 8 |
XC52 |
E |
Hydraulic Check-PSV Inlet |
L5 |
| 9 |
XC52 |
F |
Pump NPSH/Discharge |
L5 |
| 10 |
XC52 |
G |
Hydraulic Check- Pneumatic Transfer Line (Preliminary) |
L5 |
| 11 |
XC52 |
H |
Hydraulic Calculation & Line Sizing for U/G Drainage System |
L5 |
| 12 |
XC53 |
A |
Hydraulic Check-Flare Manifolds |
L1 |
| 13 |
XC53 |
B |
Hydraulic Check-Cooling Water Network |
L2 |
| Process Scheme & Simulation |
| 1 |
XC61 |
A |
Process Scheme Establishment and/or Optimization |
L3 |
| 2 |
XC61 |
B |
Plant Planning |
L2 |
| 3 |
XC61 |
C |
Process Consultation |
L4 |
| 4 |
XC61 |
D |
Preliminary Hazard Analysis |
L1 |
| 5 |
XC62 |
A |
Calculation/Simulation-Simple Separation |
L5 |
| 6 |
XC62 |
B |
Calculation/Simulation-Column |
L1 |
| 7 |
XC62 |
C |
Calculation/Simulation-Reactor |
L1 |
| 8 |
XC62 |
D |
Calculation/Simulation-Heating/Cooling Curve |
L1 |
| 9 |
XC62 |
E |
Calculation/Simulation-System Integration |
L1 |
| 10 |
XC62 |
F |
Calculation/Simulation-Heat Exchanger Network Synthesis |
L1 |
| 11 |
XC62 |
G |
Calculation/Simulation-Stack/Safeti DiffusionIFFUS |
L1 |
| Control & Instrument Process Data |
| 1 |
XC71 |
A |
Control Logic Description/Cause & Effect Requirement |
L3 |
| 2 |
XC71 |
B |
Instrument Process Data (P.L.T) |
L5 |
| 3 |
XC71 |
C |
Instrument Process Data (Flow,CV) |
L5 |
| 4 |
XC71 |
D |
Instrument Process Data (Analyzer) |
L5 |
| 5 |
XC71 |
E |
Pressure Safety Valve Calculation & Data Sheet |
L4 |
| Requisition, TBE AND Vendor Document Review |
| 1 |
XC91 |
A |
Process Package Requisition |
L4 |
| 2 |
XC91 |
B |
Technical Bid Evaluation for Process Package |
L4 |
| 3 |
XC91 |
C |
Vendor Document Reviews for Process Package |
L5 |
| 4 |
XC92 |
A |
Chemical & Catalyst Requisition |
L1 |
| 5 |
XC92 |
B |
Technical Bid Evaluation for Chemical & Catalyst |
L1 |
| 6 |
XC92 |
C |
Vendor Document Reviews for Chemical & Catalyst |
L1 |
| 7 |
XC93 |
A |
Requisition for Water & Waste Water Treatment Package |
L1 |
| 8 |
XC93 |
B |
Technical Bid Evaluation for Water & Waste Water Treatment Package |
L1 |
| 9 |
XC93 |
C |
Vendor Data Review for Water & Waste Water Treatment Package |
L1 |
| 10 |
XC94 |
A |
Requisition for Groundwater Monitor |
L1 |
| 11 |
XC94 |
B |
Technical Bid Evaluation for Groundwater Monitor |
L1 |
| 12 |
XC94 |
C |
Vendor Data Review for Groundwater Monitor |
L1 |
| 13 |
XC95 |
A |
Requisition for Air/Water Permit Application |
L1 |
| 14 |
XC95 |
B |
Technical Bid Evaluation for Air/Water Permit Application |
L1 |
| 15 |
XC95 |
C |
Vendor Data Review for Air/Water Permit Application |
L1 |
|
|