MAXIHUB LUBE OIL BLENDING PLANT PROJECT

MAXIHUB LUBE OIL BLENDING PLANT PROJECT

The strong economic development of Vietnam has led more demand for lubricants for construction equipment and industries. With the aim of meeting the needs of the market, promoting the local economic development, creating jobs for workers, MAXIHUB Co., Ltd with 100% foreign capital has decided to implement the investment project “Lube oil blending plant” with capacity of 32 million liters per year with 19 storage tanks with total capacity of 32,000 m3 and a jetty with the capacity 15,000 DWT in Ong Keo Industrial Zone, Phuoc Khanh Commune, Nhon Trach District, Dong Nai Province. The total area of the project is 93,980m2.

Project perspective design image

As the EPC Contractor to implement this project, CTCI Group (Taiwan) together  with CIMAS Engineering Company Ltd basically completed the whole design of the project including Process, Equipment, Civil, Piping, Electrical, Instrument, HVAC and Fire Fighting systems. The Contractor has used modern and specialized software such as CAESAR II, PDS, SAP, HTRI, PVELITE, REVIT … in the process of design calculation as well as the application of local and international codes and standards in accordance with the master planning of this area and meeting the rigorous technical specifications of this project.

Actual photo at the construction site

Currently, the project is in the construction phase of underground work, equipment foundations, office building, warehouse under strict supervision of quality, safety, progress etc. by experienced engineers of CTCI/CIMAS. The project is expected to complete the entire construction, installation, commissioning and hand over to the investor in the second quarter of 2021.

Share this post